RUVYI HYDRO POWER PLANT- BURUNDI

  • Home
  • RUVYI HYDRO POWER PLANT- BURUNDI

RUVYI HYDRO POWER PLANT- BURUNDI

LOCATION

BURUNDI

TURBINE

Horizontal
Francis Turbine

CAPACITY

P- 901.81kW (2 Units)
Q- 5.50m 3 /S
H- 36.47m

PERIOD

Nov 2024 – May 2025

IMG 20250225 WA0007 1 scaled

SCOPE OF WORKS

  • Installation of Electromechanical
    equipment; Turbines, Generators,
    Hydraulic power unit (HPU), MIV,
    Electrical Panels and control
    panel for both Unit 1 and 2.
  • Testing and commissioning